The engines
- Costing engine — A costing sheet for every style — consumption, trims, CM, overhead and margin — calculated, stored, and locked once you approve it. Change a price, and the next buyer reply quotes the new figure.
- Consumption, both families — Knit from GSM and measurements; woven from panel dimensions and fabric width — worked out from the tech pack’s own figures, never from a guess. The same numbers feed costing and MRP, so the two never disagree.
- Capacity planner — Lines, machines, efficiency and SAM give one honest answer before you commit: can we make it, and by when.
- Order matrix — The size–colour breakdown for every order, checked against the PO quantity — and it is this record, not a guess, that the materials plan is built from.
- MRP & inventory — Book an order and its materials plan is ready: gross need, stock on hand, net shortage, purchase cost. Short a material? The vendor enquiry is drafted for you — quantity, needed-by date, asking for their price — and commits to nothing until you approve it.
- Vendor comparison — Mill and trim quotes compared per style against your own FOB — owner-side only, behind an information wall. Buyers never see it.
- Tech packs, parsed — Upload a tech pack and it becomes a structured record — fabric, measurements, trims, construction, packaging — plus an honest list of what the document doesn’t say. One click turns it into a draft costing sheet.
The whole desk
- Quality & shipment readiness — Inspections are planned on AQL 2.5 (ISO 2859-1, Level II) and recorded where they happen; fabric rolls are scored on the ASTM 4-point system before cutting. Floor checks become DHU and defect analytics — the styles and lines that produce defects are named, not hidden. One firm rule: a batch does not ship until its final inspection has passed and every gating lab test is clear — or a named manager overrules, on the record. Failures open a CAPA with an owner and a due date, and the buyer update is drafted for approval, never sent silently.
- Approvals & lab tests — Every approval a buyer owes you — lab dip, strike-off, print, trim card, PP sample — tracked against a deadline counted back from the shipment date. A failed gating lab test holds the shipment until a retest passes.
- The commercial desk — The export paperwork lives beside the order it belongs to: master LC with its checklist, proforma invoices computed from the order itself, back-to-back LCs with the 48-hour opening clock, UD and EXP records, negotiation, realisation with partial receipts, cash-incentive claims with their 180-day window, and EDF loans with maturity dates. Overdue realisations draft their own chase.
- Profitability — Every order carries two margins: the one you costed and the one you are actually making. Actual cost lines and extras are recorded as they happen; the variance is shown per piece and per order, before the shipment sails — while there is still time to act.
- For buying houses — Vendor performance is measured from your own records, not from impressions: on-time shipment, inspection results, sample first-pass rate, CAPA closure and compliance documents. Inspections booked with third parties are held to the same shipment gate. Claims are recorded against the linked evidence, settlements become debit notes, commission is computed from the contract, and multi-vendor shipments are consolidated.
- Traceability & compliance — Custody is recorded stage by stage — fibre, yarn, fabric, trims, garment — tied to fabric lots and certificates — the recorded facts a digital product passport will need. Social audits and their findings, chemical declarations screened against the ZDHC MRSL, Higg FEM monthly completeness, and per-style carbon footprints with stated factor sources complete the buyer’s compliance record.
Sampling & orders
Orders and T&A milestones tracked per buyer; sample rounds followed per style, with courier and tracking. Buyers receive a secure link to view and approve their sample — no account needed, and your prices and internal notes never leave your workspace.
And it talks
Every engine result becomes communication only through a draft. Email messages are drafted the moment they arrive; WhatsApp messages are drafted the moment they arrive; WeChat threads are drafted the moment your team pastes them in; Messenger messages are drafted the moment they arrive — and every draft is also made proactively when a milestone slips or a buyer goes quiet, quoting the engines’ figures, flagged when they touch price or commitment, and sent only on Approve, Edit, or Hand off.
Priced by team size
| Tier | Users | Price | Designed for |
|---|---|---|---|
| Starter | Up to 5 | $200/mo | Small, owner-led factory & buying-house teams |
| Growth | 6–16 | $560/mo | Mid-size factories and buying houses with a structured merchandising department |
| Enterprise | 17–40 | $1,200/mo | Large factories and buying houses, users across buyer teams |
| Custom | 40+ | Custom quote | Groups and multi-site operations |